The detonations broke the bridge’s truss into small sections, enabling salvage crews to use cranes and barges to haul away the twisted metal wreckage, the U.S. Army Corps of Engineers said. The work had been planned for Sunday but it was delayed because of weather conditions.
In the early morning of March 26, the Dali lost power and crashed into a bridge support, sending the span into the Patapsco River, with a major portion draped over the Dali’s bow. Six construction workers were killed.
The incident initially halted traffic at the Port of Baltimore, which ranks first in the United States in several cargo categories, including autos and light trucks, farm and construction machinery, imported sugar and imported gypsum, according to the state of Maryland.
Since the crash, four temporary channels have been opened, allowing for some shipping to resume. The Corps said it aims to restore port access to full capacity by the end of May.
Maryland estimates it will cost 1.7 billion to 1.9 billion to rebuild the bridge and anticipates completion by fall 2028.
Subscribe to the ABS-CBN News channel! – http://bit.ly/TheABSCBNNews
Watch full episodes on iWantTFC for FREE here:
http://iwanttfc.com
Visit our website at http://news.abs-cbn.com
Facebook: https://www.facebook.com/abscbnNEWS
Twitter: https://twitter.com/abscbnnews
Instagram: https://www.instagram.com/abscbnnews
Take the opportunity to connect and share this video with your friends and family if you find it useful.
( Advertise in videos.) Ads are skippable with “Skip Ad” buttons appearing after 3-10 seconds...
Please REFRESH this page if the video are not yet complete or error. Thank you for patience. Enjoy watching. ^_^